常见问题

打桩机装配安全技术检查要点

日期:2018-03-23   来源:/
初步了解施工现场概况,确定设备堆放位置,桩机进场后要检查进场设备配件是否齐全,做好基本准备工作后开始装配,重点对以下部分内容进行检查;

A preliminary understanding of the general situation of the construction site is made to determine the location of equipment stacking. When the pile machine comes into the field, it is necessary to check whether the accessories for the access equipment are complete. After the basic preparation work is started, the assembly is started, and the following parts are checked.
(1)认真研究、掌握现场基本资料;有作业区周围竖立施工围栏和相关警示牌。
(1) to study and master the basic inion of the field, and to erect construction enclosure and related warning signs around the operating area.
(2)合理确定桩机设备的停放位置
(2) reasonable determination of the position of piling machine equipment



根据现场情况,首先要远离河塘、泥浆坑、高压线、软弱土层、周围建筑物等;按施工组织设计尽量选择在第一根施工的桩位附近堆放停靠。
According to the situation, first of all to stay away from the pond, mud pit, high-voltage wire, soft soil and surrounding buildings; according to the construction organization design is chosen in the pile near the first pile dock construction.
(3)清理装配现场障碍物、平整场地,必要时铺设垫块或枕木扩大桩机承托面积;大吨位桩机停置场地平均地基承载力应不低于35kPa。
(3) clean assembly site obstacles, leveling, laying pad or sleeper expanding pile machine bearing area should not be less than 35kPa when necessary; the bearing capacity of the pile foundation of large tonnage machine parking site average.
(4)检查设备配件、辅助施工设备是否齐全,如配重、导管、砼搅拌机、灰(泥)浆泵、电焊机、检测仪器等,施工前应按其相应安全技术规程标准进行检查,其安放位置应方便施工管理。
(4) inspection equipment parts and auxiliary equipment construction is complete, such as weight, pipe, concrete mixer, ash (mud) pump, electric welding machine, testing equipment and so on, before construction should be checked according to the corresponding technical specifications for safety standards, the location should be convenient for construction management.
(5)合理安排电气控制线路铺设位置和方向,尽量缩短桩机与配电(箱)柜之间的距离,减少线路功率损耗。一情况下,作业点(桩位)与电力供应点距离控制在200m内为宜武汉,武汉打桩机装配安全技术启动电压降不大于额定电压10%;夜间施工必须配置充足的、独立敷设线路的照明点位。
(5) rationally arrange the position and direction of electric control line laying, shorten the distance between the piling machine and the distribution (box) cabinet as far as possible, and reduce the power loss of the line. In one case, the distance between the operation point (pile position) and the power supply point is controlled within 200m. The starting voltage drop of Wuhan Wuhan piling machine assembly safety technology is not greater than the rated voltage 10%.
(6)非装配人员应远离设备装配现场。
(6) non - assembly personnel should stay away from the equipment assembly site.
希望上述介绍对您有所帮助哦,我们以真诚贴近客户,以行动满足客户,以双赢保有客户,以个性引领客户,您的满意是我们最大的追求。
I hope this introduction can help you. We sincerely close to customers, take actions to satisfy customers, win customers and personalities lead customers. Your satisfaction is our greatest pursuit.

上一篇:第一页
下一篇:夏日保养挖掘机的常识

相关资讯

【本站图片均由网站所有方提供,部分图片来源于网络,如无意中侵犯了某媒体或个人的知识产权,请来信或来电告之,本网站将立即删除。】

友情链接:幸运飞艇  幸运飞艇  幸运飞艇  幸运飞艇平台  幸运飞艇开奖记录  幸运飞艇  幸运飞艇开奖记录  

免责声明: 本站资料及图片来源互联网文章,本网不承担任何由内容信息所引起的争议和法律责任。所有作品版权归原创作者所有,与本站立场无关,如用户分享不慎侵犯了您的权益,请联系我们告知,我们将做删除处理!